Project Name: Illaroo Road Water Pump Station
Project Location: Cambewarra NSW
Project Date: May 2023
Project Description: Burtin welding of 7.1km water pipeline with pipe sizes range from 355mm PN16 through to 450mm PN25 using a PolyForce500 Tracked. Project consisting of approx. 600 field welds.
900mm Reducing Liners
For North American Machines